Home Page
Mail
Algeria Bahrain Cyprus Egypt Iran Iraq Jordan Kuwait Lebanon Libya Mauritania
Morocco Oman Palestine Qatar Saudi Arabia Sudan Syria Tunisia Turkey UAE Yemen


 
Al Rabie outlines 2010 strategy for sales growth and market expansion at annual meeting
Saudi Arabia Refuses Pakistani Diplomat Over Vulgar Name Translation
Women’s participation in global computer literacy programs rises to 35 per cent in KSA
Saudi prince explains handshake with Israeli official
Mobily’s Connect notebook bundle is Kingdom’s best-priced
Travel & Tourism key factors for KSA’s sustained economic growth amidst downturn
 
ABB wins $38 million order to improve power efficiency in Saudi Arabia
Posted: 23-11-2009 , 14:41 GMT

ABBABB, the leading power and automation technology group, has won an order worth $38 million from the Saudi Electricity Company, Saudi Arabia’s national power transmission and distribution utility, to improve the efficiency of 22 power distribution substations.


ABB will provide technologies to improve the power factor, which is an indicator of the usable power available in the grid. ABB will design, engineer, supply, install and commission the equipment. The project is expected to be completed by 2011.

 

The technologies, which will increase capacity, improve power quality and raise network efficiency, will be installed in 22 distribution substations serving the Mecca, Medina, Jeddah and Ta’if areas. Products to be supplied include capacitor banks of various ratings, medium-voltage switchgear, protection and control equipment and a SCADA (Supervisory Control and Data Acquisition) system to help the utility to manage its power network more effectively.

 

A distribution system’s operating power comprises active or “working” power and reactive or “non-working” power. Power factor represents the ratio between the two and is a measure of a power network's efficiency. Efficiency can be improved by correcting, or raising, the power factor. “Improving the efficiency of the substations will increase power availability and help meet increasing demand for quality power in the region,” said Peter Leupp, head of ABB’s Power Systems division.

© 2009 Mena Report (www.menareport.com)

Printable Version Top of Page
Printable Version
Opinions - No Opinions found for this article
 
 
 
 
 
 

  About Us Advertising Contact Us Privacy  
© 2010 Al Bawaba (www.albawaba.com)