Home Page
Mail
Algeria Bahrain Cyprus Egypt Iran Iraq Jordan Kuwait Lebanon Libya Mauritania
Morocco Oman Palestine Qatar Saudi Arabia Sudan Syria Tunisia Turkey UAE Yemen


 
Syria: Insurance premiums up by 4.36%
Jomanah Murad denies starting singing career
RAK Free Trade Zone seminar and road show targets Syrian SMEs
Haykal: Entrepreneurship-enabled Arab cities can reverse drain brain
Jomanah Murad Sings
Asala’s new Khaliji album during “Eid Al Adha”
 
Syria, Russia to establish US$2.7 billion oil complex
Posted: 28-12-2005 , 14:11 GMT

Syrian Minister of Petroleum and Mineral Resources Dr. Ibrahim Haddad and Director General of the Russian Company for Investment Credit Line have signed a Memo of Understanding to build an US$2.7 billion oil complex, consisting of an oil refinery and a petrochemical complex in the Syrian province Deir el-Zour. oil facility

 

According to the Memo, Credit Line will build the refinery, which will use imported crude oil or locally produced oil, if available. SANA reported that the Russian company will also be committed to build a petrochemical complex with an annual capacity of 1.6 million tons of nafta, and finish the project within five years maximum.

 

The Syrian side will be committed to providing the land for the project as well as carrying out the infrastructure projects, including waters, electricity, roads and administrative facilities.

 

The Syrian minister commented by saying that the production capacity of the oil refinery would be at 140,000 bpd, adding that some 2,000 workers from different skills and specialties will be needed to do the works at the refinery.

 

He added that the byproducts of the complex will be used for various products, such as home gas, polyethylene, polypropylene, gasoline and octane. This factory will need at least 1,000 workers to be completed, and the surplus could be exported.

 

The Minister said Syria’s share of the profits will be 15 % in the first 10 years, 30 % in the next five years, 45 % in the next five years and 60 % in the next five years. The whole project will be transferred to Syria after 25 years of investment.

© 2005 Mena Report (www.menareport.com)

Printable Version Top of Page
Printable Version
Opinions - No Opinions found for this article
 
 
 
 
 
 

  About Us Advertising Contact Us Privacy  
© 2009 Al Bawaba (www.albawaba.com)